Région Réunion

Home > English > Construction site > Construction of a roundabout at the western entrance of Saint (...)

Construction of a roundabout at the western entrance of Saint Denis

1er juillet 2014

Update on access

The construction work consists in setting up a structured crossroads on the RN1 (main road) and the western entrance to Saint Denis, close to the Caserne Lambert, with the aim of enabling entrance/exit to the construction site of the New Coastal Road at the Saint Denis end. The works will consist mainly of general roadworks, as well as alterations to various networks. The roundabout will give access to the construction sites for the viaduct and dike.

Planned start of construction : start of 2014 (duration of construction work : 6 months, with two months of preparation)

Cost of works : €875, 000 incl. tax

Construction to be carried out by SAS

Photos